Wind Turbine: Annual Cost

For me to better understand the capital and operation and maintenance (O&M) costs involved in installing 2 possible wind farms and the operating lifetimes, please provide the following information;

A) Calculate the predicted annual output, in MWh per year, for each site A & B shown in table 1(Attached);

B) In both cases, the capital cost is to be repaid over the estimated lifetime, at a discount rate of 10%

The annual capital repayment for site A = £110 and Site B = £117

Annual operating and maintenance (O&M) costs are in both cases equal to the given percentages of the total capital cost. Add these to give the total annual cost for each turbine.

© SolutionLibrary Inc. solutionlibary.com November 26, 2020, 1:06 am 9836dcf9d7 https://solutionlibrary.com/earth-sciences/environmental-studies/wind-turbine-annual-cost-j5ta
Attachments